Acel

The software module «Acel» is designed for complex analysis of water flooding cells and annual planning of oil production taking into account a planned volume of drilling, workovers and production loss.

The main functions of the software module «Acel» are:

  • Automatic cell partitioning;
  • Calculation of a dynamic weight;
  • Criticality analysis of cells and blocks;
  • Forecast of oil reserve;
  • Adaptation of a cells pressure using a method of material balance;
  • Estimation of wells interference;
  • Analysis of critical wells by blocks;
  • Annual planning of oil production taking into account a planned volume of drilling, workovers and production loss;
  • Conclusion of a report form, containing the result of depletion rate, injection, working agent, introduction of new production wells by development targets, deposits and fields.
  • Analysis of daily production parameters (tables and graphs of daily measurements, histogram of deviations in production, total value, average value, daily measurements, time averaging).
  • Analysis of daily measurements, adjusted at the end of the month.

acel_01.png

It is possible to specify the initial recoverable oil according to results of a development at a late stage by using an extrapolation of trend dependencies.
acel_02.PNG

The software module «Acel» allows the user to calculate an influence factor of injection well on exploitation wells. The calculation is based on development parameters (oil rate, bottom-hole pressure, etc.) and values of oil effective thickness. Results are displayed on a map in the form of arrows in the direction from the injection well to production wells with a gradation of color by the degree of influence, and in the table in the form of influence factor.
acel_03.png

Annual planning of oil production taking into account a planned volume of drilling, workovers and production loss.
It is also possible to compare the received forecasted production plan with actual development parameters and to correct the plan of workovers, taking into account the current situation of production.

acel_04.png

English